Paradigm Enterprises, Inc.

Courtenay Wind 230kV Collector Substation

Courtenay, ND | Xcel Energy and Wanzek Construction.  

Courtenay is an 115kV 240MVA dual MPT collector sub with (8) 34.5kV Feeder Circuits and (3) 115kV 30 MVAR Capacitor Banks.  Wanzek provided the substation subgrade work and both MPT foundation installations.  Paradigm furnished and installed all other foundations, grounding, conduit, cable trench, and low voltage power and control cable.  We also furnished and installed the power & control wire to connect the relay panels in the control house to the Field Termination Cabinet. Wanzek or Xcel provided all other material which was installed by Paradigm for a complete substation installation.  We worked with Wanzek’s Senior Project Manager Craig Moseng 701-893-3654 cmoseng@wanzek.com and Electrical Superintendent Chad Banish 507-828-7943 cbanish@wanzek.com