Newkirk, OK | Frontier Windpower, LLC and Wanzek Construction.
Frontier is a 211 MVA 345kV Collector Substation with an open-air tubular aluminum bus design consisting of (8) 34.5kV Feeder Bays. Paradigm furnished and installed all foundations, fencing, grounding, conduits, cable trench and low voltage power & control cable. All other material was furnished by Wanzek or the Owner and installed by Paradigm. Matt Nitschke is the Project Manager for Wanzek Construction, 701-281-6419 mnitschke@wanzek.com and Ronnie Case is Wanzek’s Assistant Project Manager, 701-893-3602 rcase@wanzek.com