Newkirk, OK | Frontier Windpower, LLC and Wanzek Construction.
The Frontier Transmission Line a 5 mile 345kV double bundled 795 ACSR line built with guyed steel mono-pole angles and direct embed steel mono-pole tangent structures. All material was furnished by Wanzek or the Owner and installed by Paradigm by Paradigm. Matt Nitschke is the Project Manager for Wanzek Construction, 701-281-6419 mnitschke@wanzek.com and Ronnie Case is Wanzek’s Assistant Project Manager, 701-893-3602 rcase@wanzek.com