Paradigm Enterprises, Inc.

Persimmon Creek 345kV Transmission Line

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction 

The Persimmon line is a 4.5 mile concrete mono-pole 345kV line with direct buried poles, guyed angles and bundled 795 ACSR conductor.  The line ties the Persimmon Collector Substation to the Persimmon Switchyard.