Paradigm Enterprises, Inc.

Elora Wind Transmission Line

Elora, TN | NextEra Eergy/Energy Erectors.   This was a 5 mile 161kV Transmission Line in a heavily wooded area where there was extensive site work ...
MORE >>>

Persimmon Creek 345kV Substation

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction.   Persimmon is a 233MVA 345kV Collector Substation designed for expansion with an extra 345kV Breaker ...
MORE >>>

Persimmon Creek 345kV Switchyard

Vici, OK |  North Buffalo Wind, LLC and Wanzek Construction.   The Persimmon Switchyard is a 3 breaker ring bus designed to tie the Persimmon Wind ...
MORE >>>

Persimmon Creek 345kV Transmission Line

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction  The Persimmon line is a 4.5 mile concrete mono-pole 345kV line with direct buried poles, ...
MORE >>>

Elora Wind Transmission Line

Elora, TN | NextEra Eergy/Energy Erectors.   This was a 5 mile 161kV Transmission Line in a heavily wooded area where there was extensive site...

More >>>

Persimmon Creek 345kV Substation

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction.   Persimmon is a 233MVA 345kV Collector Substation designed for expansion with an extra 345kV...

More >>>

Persimmon Creek 345kV Switchyard

Vici, OK |  North Buffalo Wind, LLC and Wanzek Construction.   The Persimmon Switchyard is a 3 breaker ring bus designed to tie the Persimmon...

More >>>

Persimmon Creek 345kV Transmission Line

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction  The Persimmon line is a 4.5 mile concrete mono-pole 345kV line with direct buried...

More >>>