Paradigm Enterprises, Inc.

Stephens Ranch Phase II North 345kV T-Line

O’Donnell, TX | Stephens Ranch Wind Energy/Wanzek Construction. This 6 mile 345kV, single circuit, double conductor line is an ongoing project which will tie the ...
MORE >>>

Baldwin Substation

Wilton, ND | Nextera Energy. This sub was the third phase of a project started by Florida Power and Light in 2005.  It was a stand-alone ...
MORE >>>

Elora Wind Transmission Line

Elora, TN | NextEra Eergy/Energy Erectors.   This was a 5 mile 161kV Transmission Line in a heavily wooded area where there was extensive site...

More >>>

Persimmon Creek 345kV Substation

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction.   Persimmon is a 233MVA 345kV Collector Substation designed for expansion with an extra 345kV...

More >>>

Persimmon Creek 345kV Switchyard

Vici, OK |  North Buffalo Wind, LLC and Wanzek Construction.   The Persimmon Switchyard is a 3 breaker ring bus designed to tie the Persimmon...

More >>>

Persimmon Creek 345kV Transmission Line

Vici, OK | North Buffalo Wind, LLC and Wanzek Construction  The Persimmon line is a 4.5 mile concrete mono-pole 345kV line with direct buried...

More >>>